Green steel trial at the wastewater plant
Summary
The plant is only the second city in the country trialing 'green steel' — steel mill slag — to replace ferric chloride for phosphorus removal. Sixty days in, the plant is running better than ever with a third less chemical, and staff built the feeder in-house for $2,150 instead of a $100,000 system.
At a glance
- Total mentions
- 1
- Last 30 days
- 1
Discussed at 1 meeting in the last 60 days; most recently Oct 12, 2026.
Impact analysis
Could save real money on chemicals — ferric chloride use is already down by a third.
Ratepayers, through lower chemical costs and better plant performance.