Civic Issues
Topics getting the most attention in Manitowoc public meetings, ranked by how frequently they are discussed.
AllLast 30 daysLast 6 months|criticalhighmediumlow|Taxes BudgetPublic SafetyRoadsDevelopmentParks RecWater UtilitiesBusiness JobsEnvironment
Filtered to Water Utilities
Filtered to 30d
2 issues in water utilities
MediumWater Utilities
Storm sewer endwall repair at Waldo Blvd. and Fleetwood Dr.
A storm sewer endwall at Waldo Blvd. and Fleetwood Dr. is being repaired under a $12,900 contract with MC Excavating. It's a small but necessary fix to keep the storm drainage system working in that area.
1 mention (1 this month)Last discussed Oct 22, 2026
HighWater Utilities
Sanitary Sewer Master Plan
The city paid $27,275 to Foth Infrastructure for ongoing work on its sanitary sewer master plan — the long-term roadmap for sewer infrastructure.
4 mentions (1 this month)Last discussed Oct 8, 2026